The Pressure Equipment Directive (PED) 2014/68/EU sets the requirements for designing, manufacturing, and placing pressure equipment on the EU market. For manufacturers, this means that every weld on a pressure-bearing component must be performed according to a qualified procedure by a qualified welder. The documentation proving this is not optional. It is the legal basis for CE marking.
The PED classifies pressure equipment from Category I (lowest risk) to Category IV (highest risk), based on pressure, volume, and fluid type. As the category increases, so do the documentation requirements and the degree of third-party oversight. Understanding which category your equipment falls into determines what your quality system must produce before production starts.
What the PED requires from welding
Welding is classified as a special process under the PED because defects may not be detectable until the equipment is in service. This means the directive requires documented evidence that both the procedure and the welder have been qualified before production begins. The documentation must be available for inspection by a Notified Body and must remain on file for ten years after the equipment is placed on the market.
The applicable harmonised standards for welding under the PED are EN ISO 15614-1 for procedure qualification and EN ISO 9606-1 for welder qualification on steel. Compliance with these standards provides a presumption of conformity with the relevant Essential Safety Requirements of the directive.
Documents that make up the Technical File
The Technical File is the complete evidence package demonstrating compliance. For welding, it must include the Welding Procedure Specification (WPS) and the supporting Procedure Qualification Record (PQR), welder performance qualifications (WPQ or WPQR) for all personnel involved, material certificates (typically EN 10204 3.1 for pressure-bearing parts), welding logs with full traceability per joint, non-destructive testing reports, and the Declaration of Conformity.
Every document must be traceable to the specific equipment it covers. This means the weld log must link each joint to the welder who made it, the WPS used, and the material heat number. A gap in any of these connections can trigger a non-conformity finding during a Notified Body review.
Notified Body involvement by category
For Categories I and II, manufacturers can typically self-certify compliance. From Category III onwards, a Notified Body must be involved in reviewing and approving the welding procedures and welder qualifications before production begins. For Category IV equipment, the Notified Body’s involvement is continuous, covering process surveillance during fabrication as well as documentation review.
Welder qualifications issued under EN ISO 9606-1 by a Notified Body are recognised across EU member states. This means a welder qualified for one project does not need to be requalified for another project in a different country, provided the qualification scope covers the required work and continuity has been maintained.
Traceability in practice
Full traceability connects every weld to its procedure, its welder, and its material. In practice, this means the weld log is the central document during production: it records the joint number, the welder ID, the WPS reference, the filler material batch number, the date, and the inspection status. Any weld without a complete log entry cannot be verified, and unverified welds cannot be included in the Technical File without additional evidence.
Managing this traceability across a full project is where documentation failures typically occur. Missing material certificates, expired welder qualifications, and incomplete weld logs are the most common causes of non-conformity findings. The SOCWeld weld data flow check shows where documentation gaps typically appear in production.
Frequently asked questions
What is the retention period for PED welding documentation?
The PED requires manufacturers to retain all technical documentation for ten years after the last piece of equipment has been placed on the market. This covers the complete file: WPS, PQR, welder certificates, weld logs, NDT reports, and the Declaration of Conformity.
Does PED apply to welding repairs on existing equipment?
Yes, if a repair or modification is considered substantial enough to alter the equipment’s design or safety integrity, it requires a new conformity assessment. This means the welding procedures and documentation requirements apply in the same way as for new equipment. Each case must be assessed individually.
Can welder qualifications from one EU country be used in another?
Yes. Qualifications issued by a Notified Body under EN ISO 9606-1 are recognised across EU member states. For Categories III and IV, the approval must come from a Notified Body or a Recognised Third-Party Organisation. Provided continuity has been maintained and the scope covers the required work, requalification is not needed for each new country or project.
What happens when a Notified Body finds non-conformities?
The Notified Body issues a Non-Conformity Report. The manufacturer must implement a corrective action plan, document the resolution, and obtain sign-off before production can continue or CE marking can be issued. Equipment cannot be placed on the market until all findings are closed.
Which welding standard applies to procedure qualification under PED?
EN ISO 15614-1 is the primary harmonised standard for welding procedure qualification on steel and nickel alloys under the PED. EN ISO 15614-2 covers aluminium. ASME Section IX is used on projects following American codes, though it is not a harmonised standard under the EU directive.
SOCWeld organises WPS, WPQR, and weld log data in one place, keeping the Technical File audit-ready throughout production. Book a demo to see how it works on a live PED project.