Non-destructive testing is a required part of welding quality control in shipbuilding, but the physical test is only half of the requirement. The documentation of that test, including what was done, by whom, using what equipment, and with what result, is what class societies and auditors actually evaluate. A weld that was tested but poorly documented is a liability at inspection.
The main NDT methods and their documentation requirements
Four methods cover the majority of NDT requirements in shipbuilding. Each has specific documentation needs beyond a simple pass or fail notation.
Ultrasonic testing (UT) detects internal volumetric defects. A valid UT report must document the probe angle and frequency, the calibration block used, the reference sensitivity, and the scanning pattern. Without calibration data, a third-party auditor cannot reconstruct the test conditions, and the report loses its evidential value.
Radiographic testing (RT) also addresses internal defects and produces a permanent image record, either on film or in digital format. Digital RT records must include metadata confirming exposure parameters such as source distance and exposure time. Film storage is a long-term logistics consideration; many yards have moved to digital radiography for that reason.
Magnetic particle testing (MT) detects surface and near-surface discontinuities in ferromagnetic materials. Reports must document the equipment used, the magnetization technique, the particle type, and the acceptance criteria applied. Penetrant testing (PT) covers surface-breaking defects in non-ferromagnetic materials. PT reports require documentation of the penetrant system, dwell time, and inspection conditions.
Personnel qualification and the Level II requirement
All four methods require that results are interpreted and signed off by a technician certified to at least Level II under ISO 9712. Level I technicians can perform testing under direct supervision but cannot independently issue final results. Class societies require confirmation that the person signing an NDT report holds valid Level II certification for the applicable method. The certification must be current and traceable.
Matching the NDT method to the WPS requirement
The applicable Welding Procedure Specification specifies which NDT method is required for each joint type. If the WPS requires UT on a full-penetration butt weld, a PT report for the same joint does not satisfy that requirement. This is a common source of documentation gaps when multiple subcontractors are involved or when NDT is managed separately from the weld log.
EN 1090 adds another layer by linking required testing frequency to execution class. EXC3 projects, common in primary structural shipbuilding work, require significantly higher NDT sampling rates than EXC2. Tracking compliance with these percentages across a large weld program manually is error-prone.
Documenting repairs and re-tests
When a weld fails NDT, the documentation chain for that joint must record the initial failure, the repair performed, and the final re-test result as a linked sequence. A final-pass result with no record of the preceding failure is incomplete. Class surveyors look specifically at repair cycles because a high repair rate on a specific welder can be grounds for reviewing their qualification.
Linking NDT records to the weld log
Each NDT report should be linked to the specific joint identifier in the master weld log. That identifier connects the test result to the welder who performed the work, the WPS applied, and the material certificate for the base metal. When these records are kept in separate systems or physical binders without a clear connecting reference, the traceability chain that class societies require becomes difficult to demonstrate under audit conditions.
Digital documentation structures this connection at the point of data entry. A technician uploading an NDT result links it directly to the joint record, which already carries the welder ID, WPS reference, and heat number. The resulting documentation package is queryable by any of those identifiers without manual cross-referencing. SOCWeld’s maritime documentation covers how this is structured for offshore and shipbuilding projects.
Frequently asked questions
What information must an NDT report include to satisfy class society requirements?
At minimum: the joint identifier, the NDT method used, the equipment and calibration data, the acceptance criteria applied, the result, and the signature of a certified Level II technician. The specific report format may also be governed by the applicable standard, such as ISO 17637 for visual testing or ISO 17640 for UT.
Can digital NDT reports be used for class approval with DNV or Lloyd’s Register?
Yes. Both DNV and Lloyd’s Register accept digital NDT records provided the system maintains data integrity and a clear audit trail. The key requirements are that records cannot be altered without a traceable history and that the digital format includes all mandatory data fields. The classification society’s relevant type approval or documentation requirements should be confirmed for the specific project.
What happens if an NDT report is missing before class inspection?
If a required NDT record cannot be produced, the affected weld typically needs to be re-tested. Class surveyors do not accept verbal confirmation or incomplete records as a substitute for documentation. Re-testing causes delays and costs that could have been avoided with a complete records management approach from the start of the project.
Is a Level II certificate required for all NDT work in shipbuilding?
Level I technicians can perform testing under direct supervision, but the final interpretation and sign-off must come from a Level II certified technician under ISO 9712. For critical structural welds, class societies require Level II oversight as a minimum. Level III may be required for specific methods or applications depending on the project’s classification requirements.
How long do NDT records need to be retained for a shipbuilding project?
Records should be retained for the operational life of the vessel and are typically required to be available for class renewal surveys, insurance assessments, and failure investigations that may occur decades after delivery. The minimum retention period depends on the flag state and classification society requirements. Book a demo to see how long-term NDT record management is handled in practice.