A Procedure Qualification Record (PQR) is the documented evidence that a welding procedure produces a sound joint under the conditions tested. In shipbuilding, this evidence must be approved by the vessel’s classification society before production welding begins. Without a valid PQR, a shipyard cannot demonstrate that its welding methods meet the structural and mechanical requirements of the hull or its systems.
Shipbuilding uses the same fundamental qualification framework as other industries, governed primarily by ISO 15614-1 for steel welding. The key difference is the involvement of classification societies such as DNV, Lloyd’s Register, and Bureau Veritas. These bodies witness the test weld, review the laboratory results, and must endorse the PQR before it can support any production WPS.
What a PQR records in shipbuilding
A PQR records the actual conditions under which the qualification test weld was made. This includes the welding process, base material and material group, filler material, joint design, dimensions, welding position, preheat and interpass temperatures, heat input, and all measured electrical parameters. After welding, the test coupon undergoes non-destructive testing (visual, radiographic or ultrasonic) and then destructive testing: tensile tests, bend tests, and Charpy V-notch impact tests. The PQR records the results of all these tests.
For maritime applications, impact testing is commonly performed at low temperatures (typically -20°C or -40°C) to verify toughness under operational conditions. High-tensile steels commonly used in shipbuilding, such as DH36 and EH36, require careful matching of filler materials and careful control of heat input to achieve the specified mechanical properties. The PQR provides the documentary proof that this matching works under the conditions tested.
PQR, WPS, and WPQR: how they relate
The PQR is the evidence that supports one or more Welding Procedure Specifications (WPS). The WPS is the production document the welder follows. The PQR is the technical basis that shows the WPS is qualified. In ISO-compliant environments, the term WPQR (Welding Procedure Qualification Record) is sometimes used to refer to the combined record submitted to the classification society for endorsement. A single PQR can support multiple WPS documents, provided all the production variables fall within the qualified ranges established by the test.
WPS documents that reference a PQR without a valid classification society endorsement are technically invalid for production. On large vessel projects with many different material specifications, joint configurations, and welding positions, maintaining a clear map of which PQRs support which WPSs is one of the primary administrative challenges for the welding coordinator.
Essential variables and when requalification is needed
Under ISO 15614-1, changes to essential variables beyond the allowed limits invalidate the existing PQR and require a new qualification test. Essential variables in shipbuilding include the material group (a change from Grade A to DH36 triggers a new test), the welding process, the thickness range, the filler material type, and the shielding gas composition. Heat input changes beyond the allowed tolerance are also essential. Non-essential variables, such as groove angle and joint preparation details, can be modified on the WPS without requiring a new PQR.
Because qualification tests are time-consuming and expensive, shipyards plan the scope of each test to cover as wide a range as possible. A test on a 12 mm plate typically qualifies a thickness range from 3 mm to 24 mm under ISO 15614-1, which is enough to cover the majority of structural hull plating. See how SOCWeld organises PQR and WPS documentation for maritime projects.
Managing PQR validity and reuse
Unlike welder qualifications, a PQR does not expire. It remains valid as long as the welding process and essential variables remain unchanged. A PQR from a previous project can be reused on a new vessel, provided the classification society for the new project accepts the original record. Shipyards typically build a library of approved PQRs over time, which is one of the most valuable assets in the welding quality system because it avoids the cost of repeated qualification testing.
The risk with reusing PQRs is that the connection between the original test record and the production WPS can be lost as projects and personnel change. If a WPS references a PQR that cannot be located or verified, the WPS becomes unsupported and a new qualification test is required before production can continue.
Frequently asked questions
Does every vessel project require its own PQRs?
No. PQRs belong to the shipyard, not to the vessel. As long as the materials, processes, and variables on a new project fall within the qualified ranges of existing PQRs, the same documents can be used. The classification society for the new project must accept them, which normally involves reviewing the original records and endorsements.
Do PQRs expire in shipbuilding?
PQRs do not have an expiry date under ISO 15614-1. They remain valid indefinitely, provided the essential variables have not changed beyond the qualified ranges. If the welding process, material group, or other essential variable changes, a new qualification test is required. Unlike welder qualifications, there is no periodic reconfirmation requirement for the procedure record itself.
Must a classification society surveyor witness the PQR test?
Yes. For structural shipbuilding, the test weld must be witnessed by a classification society surveyor, who reviews the laboratory results and endorses the record. Self-certification is not accepted for hull structures and pressure-bearing systems. The surveyor’s signature on the PQR is the basis for its use in production.
Can one PQR support welding in multiple positions?
Only if the test was performed in a position that qualifies the others. Under ISO 15614-1, certain test positions provide wider positional coverage than others. A test in the overhead position (PE), for example, qualifies a wider range than a flat position (PA) test. The qualified positions are defined in the standard and must be checked against the intended production positions before relying on an existing PQR.
What happens if the original PQR cannot be located?
If a PQR cannot be produced, the WPS it supports has no verifiable basis and cannot be used in production. The shipyard must conduct a new qualification test to restore the documented evidence. This is a significant risk in shipyards that rely on physical binders and paper-based filing systems, where records can be lost during organisational changes or when long-running projects span multiple office moves.
SOCWeld keeps PQR records linked to the WPSs they support, making it straightforward to verify qualification coverage during pre-production planning and classification society reviews. Book a demo to see how it works on a maritime project.