A Procedure Qualification Record (PQR) is a document that records the actual results of a welding test. When you qualify a welding procedure, you document everything that happened during that test in the PQR: base materials, filler materials, temperatures, heat input, and the results of subsequent mechanical testing.
The PQR is the evidence behind your Welding Procedure Specification (WPS). A WPS tells welders how to perform a weld. The PQR is the test record that proves the procedure works. Without a qualified PQR supporting it, a WPS carries no formal validity under most standards.
What a PQR documents
A PQR records the essential variables as they were actually used during the qualification test. This typically includes base material specifications and thickness range, filler material type and classification, pre-heat and interpass temperatures, post-weld heat treatment, welding position, and the results of mechanical tests — tensile, bend, impact, and any others required by the applicable standard.
The PQR stays in your quality documentation. When a customer, notified body, or auditor asks whether your welding procedures are formally qualified, the PQR is the document that answers that question.
PQR and WPS: the distinction
Many people confuse PQR and WPS because they cover much of the same information. The distinction is straightforward: the WPS is the instruction; the PQR is the test record.
You qualify a procedure by performing a test weld under controlled conditions. A qualified inspector or testing laboratory evaluates the weld through mechanical testing. The results go into the PQR. If the tests pass, you can write a WPS based on that PQR.
One PQR can support multiple WPSs, as long as the WPS parameters stay within the ranges the PQR qualifies. Changing certain essential variables typically requires a new qualification test and a new PQR.
Which standards apply
The standards that govern PQRs depend on where you operate and what you produce. The most common are ISO 15614 for European manufacturers, ASME IX for pressure equipment in North American markets, and AWS D1.1 for structural steel fabrication. EN 15085 applies to railway welding.
Each standard defines its own essential variables, required tests, and acceptance criteria. If you supply into multiple markets or industries, you may need PQRs qualified under different standards for the same welding process.
Managing PQRs across production
Keeping PQR documentation organized is an ongoing challenge. Procedures expire, standards get updated, and new base materials or filler materials may require new qualifications. Without a system, it is easy to lose track of what is qualified, what is approaching expiry, and what new contracts will require.
Many manufacturers manage this through digital documentation platforms that link WPSs to their supporting PQRs, flag qualifications approaching expiry, and make everything accessible during audits without searching through physical files. You can see how SOCWeld works for welding procedure management, or book a 30-minute call to see it applied to your specific setup.
FAQ
What is the difference between a PQR and a WPS?
A WPS is the welding instruction that tells welders how to perform a weld. A PQR is the test record that proves the procedure works. The WPS is derived from the PQR. You cannot issue a formally valid WPS without a qualifying PQR to back it up.
How long is a PQR valid?
PQR validity depends on the standard. Under ISO 15614-1, a PQR has no fixed expiry as long as essential variables remain unchanged and the manufacturer maintains continuity of production. Under ASME IX, similar principles apply. Changes to essential variables, materials, or production conditions may invalidate an existing PQR.
Can one PQR support multiple WPSs?
Yes. A single PQR can support multiple WPSs, provided the WPS parameters fall within the qualified ranges. This is common practice for manufacturers who weld similar materials across different projects.
Who can witness a PQR test?
Depending on the standard and customer requirements, a PQR test may be witnessed by a third-party inspection body, the customer, or an authorized company representative. For pressure equipment under the PED directive, a notified body is typically required.
Do I need a new PQR if I change filler material?
It depends on the standard and the nature of the change. Under ISO 15614-1, certain filler material changes are essential variables that require re-qualification. Consult the standard or a certified welding coordinator to confirm whether your specific change triggers a new test.
Can I use a PQR from a subcontractor?
This varies by standard and contract. Some standards allow PQR transfer between organizations under defined conditions. In practice, customers and notified bodies often require PQRs to be held by the manufacturer performing the welding. Check your standard and contract requirements.